This page is intended to satisfy the requirement under the CCR Rule (section 257.107) to maintain a publicly accessible Internet site (CCR Web site) containing the information specified in that section. The required information will be posted when it is available.
Elmer Smith Station (ESS) Reports and Operating Criteria
- Ash Pond Initial and Post Closure Plan
- Hydrologic And Hydraulics Capacity Requirements
- Ash Pond Liner Determination
- Fugitive Dust Plan Revision 0
- Annual CCR Fugitive Dust Control Report 2016-2017
- Groundwater Monitoring System Certification
- Ground Water Monitoring System Statistical Certification
- Ground Water Monitoring and Corrective Action Report 2017
- Assessment Monitoring Notification
- Location Restriction Evaluation
- SSL Notification
- Annual CCR Fugitive Dust Control Report 2018
- ACM Notification
- Ground Water Monitoring and Corrective Action Report 2018
- Assessment of Corrective Measures Report
- Semi-Annual CCR Remedy Selection Progress Report 1
- Annual CCR Fugitive Dust Control Report 2019
- Ground Water Monitoring and Corrective Action Report 2019
- Semi-Annual CCR Remedy Selection Progress Report 2
- Semi-Annual CCR Remedy Selection Progress Report 3
- Annual CCR Fugitive Dust Control Report 2020
- Ground Water Monitoring and Corrective Action Report 2020
- Remedy Selection Report
- Groundwater Monitoring System Certification_Amendment 2
- Annual CCR Fugitive Dust Control Report 2021
- Ground Water Monitoring and Corrective Action Report 2021
- SSL Notification